Attention of gas boiler commissioning:
1. Pay attention to fuel
Before the boiler is used, check whether the gas meets the prescribed requirements, and ensure that the gas supply pipeline, valve and other unimpeded and no leakage occurs.
2. Pay attention to water supply
Boiler water supply system is complete and normal, meet the boiler water standards and quality, need to do a good job of water quality monitoring.
3. Pay attention to the control system
Gas boiler adopts PLC control system, check the indicator light, touch the button to start and stop and so on is in normal state.
4. Arrange debugging personnel reasonably and check all kinds of tools required for debugging work. Check inside and outside after debugging to prevent tool parts from falling down.